June 28, 2023 News
Work has largely wrapped up at the City of Dayton’s Total Phosphorus Treatment Project!
The project was designed to facilitate NPDES Nutrient Removal Compliance with the addition of a new Chemical Feed System to be piped to the existing aeration process. This new system includes 7 ea Chemical Bulk Storage Tanks, associated pumps and piping and new chemical delivery infrastructure. Due to additional solids processing needs and the age of the current Diffused Air Floatation (DAF) Tanks, the project scope was also designed to include removal and replacement of the 4 ea DAF Tanks with 4 ea Rotary Drum Thickeners, an associated Polymer System and new Thickened Waste Activated Sludge Pumps. ºÚÁÏ³Ô¹Ï phased the construction of this project to prioritize the plant’s operations in the existing building.
West Carrollton Middle School/High School Update
September 18, 2025News
2025 Joe Reich Safety Award: Reid Health Connersville Campus Ambulatory Care Center
September 17, 2025Awards
Wagram Wastewater Treatment Center Nears Benchmark
September 15, 2025News
Laurel School's Gator Garage Renovation
September 10, 2025Mission
The ºÚÁÏ³Ô¹Ï Foundation Distributes $60K in its Sixth Grant Cycle
September 8, 2025Mission
Congratulations Carter Daly Recipient of Harry F. Gaeke Memorial Scholarship
September 4, 2025News
BILA Solar North American Headquarters is a Monumental Awards Finalist
September 2, 2025Awards
2025 Construction Employers Association Building Excellence & Craftsmanship Awards
August 27, 2025Awards
Completion of Kershaw Water Treatment Plant
August 26, 2025News
Fourth Annual ºÚÁÏ³Ô¹Ï Foundation Invitational - Cleveland
August 25, 2025Mission
Summer 2025 Co-Op Semester in Review
August 22, 2025News
2025 Builders Exchange of Dayton Awards
August 21, 2025Awards