June 28, 2023 News
Work has largely wrapped up at the City of Dayton’s Total Phosphorus Treatment Project!
The project was designed to facilitate NPDES Nutrient Removal Compliance with the addition of a new Chemical Feed System to be piped to the existing aeration process. This new system includes 7 ea Chemical Bulk Storage Tanks, associated pumps and piping and new chemical delivery infrastructure. Due to additional solids processing needs and the age of the current Diffused Air Floatation (DAF) Tanks, the project scope was also designed to include removal and replacement of the 4 ea DAF Tanks with 4 ea Rotary Drum Thickeners, an associated Polymer System and new Thickened Waste Activated Sludge Pumps. ºÚÁÏ³Ô¹Ï phased the construction of this project to prioritize the plant’s operations in the existing building.
We hope to see you at the 2024 Cogence Alliance Town Hall
September 10, 2024News
OWEA Buckeye Bulletin features ºÚÁϳԹÏ's Global Mission Trip Program
September 9, 2024Mission
Living our Mission: August 2024 Project Outreach
September 5, 2024Mission
Mid-Atlantic Team Outing: RushHour Karting
September 4, 2024News
Third Annual ºÚÁÏ³Ô¹Ï Foundation Invitational - Cleveland
September 3, 2024Mission
Dave Ferris named CEA Craftsman of the Year
September 3, 2024Awards
Kent City Schools Career Technical Education Addition Groundbreaking
August 30, 2024News
Volunteering at Reid Ride
August 29, 2024Mission
2024 Builders Exchange of Dayton Awards
August 28, 2024Awards
I Build America - Ohio features ºÚÁϳԹÏ's Sam Tunnacliffe
August 26, 2024News
2024 One Water Ohio Conference
August 9, 2024News
Co-Op Semester in Review
August 5, 2024News