June 28, 2023 News
Work has largely wrapped up at the City of Dayton’s Total Phosphorus Treatment Project!
The project was designed to facilitate NPDES Nutrient Removal Compliance with the addition of a new Chemical Feed System to be piped to the existing aeration process. This new system includes 7 ea Chemical Bulk Storage Tanks, associated pumps and piping and new chemical delivery infrastructure. Due to additional solids processing needs and the age of the current Diffused Air Floatation (DAF) Tanks, the project scope was also designed to include removal and replacement of the 4 ea DAF Tanks with 4 ea Rotary Drum Thickeners, an associated Polymer System and new Thickened Waste Activated Sludge Pumps. ºÚÁÏ³Ô¹Ï phased the construction of this project to prioritize the plant’s operations in the existing building.
Brookville Reservoir Sign Removal and Replacement
March 1, 2023Mission
Career & Technical Education (CTE) Month - Mid-Atlantic Efforts
February 28, 2023Mission
Take a Look Inside ºÚÁϳԹÏ's Rich History
February 27, 2023News
ºÚÁÏ³Ô¹Ï Employees Receive New Certifications
February 24, 2023News
ºÚÁÏ³Ô¹Ï is a 2023 Best Place to Work in Indiana!
February 23, 2023Awards
ºÚÁÏ³Ô¹Ï Names Q4 2022 Craft Safety Award Winners
February 22, 2023News
Career & Technical Education (CTE) Month - Indianapolis Efforts
February 20, 2023Mission
ºÚÁϳԹÏ's Jeff DeRamus Speaks at Carolinas AGC 2023 Convention
February 16, 2023News
Employees Hit the Slopes - Ski Trip to Snowshoe Mountain
February 15, 2023News
Career & Technical Education (CTE) Month - Dayton Efforts
February 13, 2023Mission
Sierra Nevada Corporation Celebrates Opening of New Hangar in Dayton
February 10, 2023News
Career & Technical Education (CTE) Month - Cleveland Efforts
February 9, 2023Mission