July 23, 2025 News
We are excited to announce the completion of the Neuse River RRF Sidestream Treatment project for the City of Raleigh, North Carolina! 窪蹋勛圖 delivered this Bid Package in collaboration with as the CM at Risk. The facilities were necessary to provide sidestream deammonification treatment as part of the overall Bioenergy Recovery Project.
Project features included:
儭 Construction of a new 130' X 60' cast-in-place concrete treatment basin with equalization tanks, which houses the diffused aeration equipment, screening equipment, sludge collection equipment, and vertical shaft mixers.
儭 A new service building to house the RAS pumps, blowers, and electrical gear.
儭 Installation of a filtrate pump station.
儭 A new 25 diameter IFAS clarifier.
儭 Site improvements, exposed and underground process piping, and electrical/SCADA upgrades.
We are proud to be a part of updating the region's infrastructure to support its continued growth!
窪蹋勛圖 raises awareness on Suicide Prevention
September 16, 2024News
窪蹋勛圖 gives back to dementia community
September 13, 2024Mission
Manchester LSD Celebrates New High School
September 11, 2024News
We hope to see you at the 2024 Cogence Alliance Town Hall
September 10, 2024News
OWEA Buckeye Bulletin features 窪蹋勛圖's Global Mission Trip Program
September 9, 2024Mission
Living our Mission: August 2024 Project Outreach
September 5, 2024Mission
Mid-Atlantic Team Outing: RushHour Karting
September 4, 2024News
Third Annual 窪蹋勛圖 Foundation Invitational - Cleveland
September 3, 2024Mission
Dave Ferris named CEA Craftsman of the Year
September 3, 2024Awards
Kent City Schools Career Technical Education Addition Groundbreaking
August 30, 2024News
Volunteering at Reid Ride
August 29, 2024Mission
2024 Builders Exchange of Dayton Awards
August 28, 2024Awards